https://test-backlink-1.blogspot.com/ https://test-backlink-2.blogspot.com/ https://test-backlink-3.blogspot.com/ https://test-backlink-4.blogspot.com/ https://test-backlink-5.blogspot.com/ https://test-backlink-6.blogspot.com/
May 2015 - Bethany Birches Camp

Archive for May, 2015

Staff Sneak Peak: Introducing DAN as Interim Program Director

For the first time in a decade someone other than Cheeks will hold the role of BBC Program Director. While Cheeks is learning how to take care of a newborn, Dan will be leading the BBC Summer Program. Both people are excited for the summer ahead of them. Read on to find out more about Dan and why he’s excited to be at BBC this summer:

“The Lord’s hand was clear in guiding me to this place. After spending months looking for jobs at a camp, the Lord brought me on a trip from Pennsylvania to Virginia where I heard about this job in Vermont. I’ve been on site for just a few days now and have already fallen in love with the camp; the rustic atmosphere, my loving and godly co-workers, and of course the gaga pit! I’ve already sat down with Cheeks and done some major planning for this summer, and let me say, it’s going to be AWESOME! I’m so excited to present some amazing new games and activities that I’ve learned at my other camps, while bringing back some classic BBC camp games!”

Dan has a host of experience in camping. He spent the last 6+ summers working at camps and he grew up at camp. He recently graduated from Cairn University with a double major in Bible and Music Education. He’s been at BBC since Wednesday and already he’s seen most of camp, eaten at Ramunto’s and played games with Nanuk. COME JOIN US on the hill this summer to meet him in person and find out his camp name!

Dan Laubach as Interim PD for 2015

Dan Laubach as Interim PD for 2015

Construction Update Week of May 11:

The week is winding down now. Make It Rain is on site for the weekend.  Our fearless leader, Greg Jenne is leading them.  Some neighbors and members of Bethany Mennonite Church came out for the morning.  Earlier in the week, a volunteer group from Franconia Mennonite Church came. And they made progress!  Sheet rock was hung, taped and mud. Siding and roofing continued. Underground electric continued.  We are pushing hard to get in before summer.  Will you come help?

Construction Update – week of May 3:

The week is shaping up to be a great week for pavi progress! Martin Excavating is scheduled to return to begin the final grading so keep your eye out for large machines back on the hill! Bill Derstine, Ralph Leatherman & Rich Leatherman (all of the Southeastern PA area) are joining Harold Bergey and Andy Bird to keep going on the rough wiring and service hook up. Inside the building you’ll also find drywalling in the kitchen continuing by the crew of Jenne Construction and PEW Builders. The large trench you can see off the front right corner of the building is thanks to Dale Snader of Dale’s homes who came up last week to do some digging for the electrical hook up. If the pavi cam could pan the rest of the camp you’d see there is much clean up and work to do before summer which starts in less than 2 months! Can you come help us get ready for summer?

Cheeks is Pregnant!

Yes, it’s true. Her due date is June 26. We’re posting here to make sure the whole Bethany Birches family knows this exciting news.  This will be our (Tuna and Cheeks) first child.  We were so busy with camp for many years that we didn’t consider children.  One day, Cheeks turns to me (Tuna) and says by the time I’m 30, I want to know if we’re going to have children. I said OK.  30 came and went.  So did 31.  By the time we were 32 we were ready for a child.  And in our 33rd year, we will have a baby, Lord willing.  It’s amazing how God works in our hearts and adjusts our perspectives over time.

As you know, June, July and August are the three busiest months of the year here at camp.  Probably not the ideal time to welcome a new person into the world.  But, we are.  And we are thankful for the opportunity to have a child.  So the camp started looking for an interim program director since Amber will not be able to do her job this summer.  We offered the position to Dan Laubach and he accepted.

The full story on staffing at camp, in case you’re wondering:

  • I (Tuna) will continue to be the Executive Director
  • Cheeks may or may not return to her post as Program Director (she is allowed a little more time to decide that)
  • Dan, the interim Program Director, is committed through October at least.
  • Many of the summer staff are returning from prior years.

If you’re at camp this summer, you will recognize many of us from past summers.  And you might even see baby Tunacheeks!

Hope to see you at camp soon!

Tuna

(aka Brandon)

 

 

Pavi Construction Update April 1-30

What a month! The pavi has been transformed from a partly finished shell to an almost summer-ready building…well, parts of it.

Progress could not be made without the help of so many volunteers! People have come from far (PA) and close (Lynds Hill Road) to help get the pavi ready for Summer 2015.

Progress also could not be made without the daily efforts of the Jenne Construction Crew. We’re thankful they braved the mud season & cold spring temps to keep moving the pavilion closer to finished!

Despite all the progress that’s been made during the month of April there remains quite a ways to go! Do you have anytime during the month of May to join us in getting the pavilion ready for summer? Email us or call the office to let us know when you can come. If you can’t come to help in May be sure to join us this summer! Bring a camper or come volunteer!

Read on for a recap of pavi work throughout the last month.  Click the link to see Pavilion Progress Pics and the people who have been doing the work.

Pavi Construction Update week of April 6
Another exciting week at BBC! A group of 13 are here from Salford Mennonite Church (Harleysville, PA). In one day (Tues) they’ve put decking on the porch roofs, started shingling, aided Harold Bergey with the electrical progress in the kitchen and continue to prepare the downstairs for insulation and sheet rock.  The crew of Jenne Construction continues to steadily move the pavilion towards completion. Pray for good roofing weather this week as many hands make the work light!

 

Pavi Construction Update: Week of April 13

There continues to be lots of action on the hill this week to move the pavilion towards a certificate of occupancy by June 1! Inside the building a team of electricians are finishing up the rough wiring and spending time on a lift to prepare the high pavi ceilings for lights. Many thanks to Harold Bergey who’s here for the third straight week and his posse of volunteers: Will Bergey, Marlin Bergey and Neil Bergey from Bergey’s Electric (Hatfield, PA). Andy Bird (Bridgewater, VT) has been volunteering his VT Masters license all week too! Roy Snell (Woodstock, VT) Ken Hershey and Larry Derstine (Bridgewater, VT) have spent 2 days shingling and siding. Nancy and Russell Pejouhy and Jeremy Ebersole (Tafstville, VT) have spent time staining interior boards. RFactor is here spraying insulation downstairs. On Tuesday Nevin and Job Mast (Oley, PA) spent the day installing piping for a central vac. Audie Bellimer (Bridgewater, VT) is making sure propane is ready to be used in the kitchen. Jon Blanch (Wallingford, VT) continues to spearhead the heating efforts. And the crew of Jenne Construction steadily contributes to pavi progress each day!

Pavi Construction Update – week of April 20:

Today marks 6 weeks exactly until we would like to gain conditional occupancy and start moving into the new pavilion.  In some ways, that seems like a long time. But it’s not!  There is much to be done before that point. If you’re able to give some time (or $$$) between now and June 1, please do!

This week a group of 10 guys from Blooming Glen Mennonite Church is volunteering.  R-Factor insulation experts are on site doing spray foam.  Jenne Construction is here, of course.  Local volunteers (Betsy Tonkin, Marcia Bender, Calef Hepler, Naomi Moyer, Joanne Hershey and others) are staining board after board.  Porches are being finished and then siding will continue with help from Ken Hershey, Roy Snell and Larry Derstine.  Roofing will continue as weather allows (it snowed some today, April 20).  Electrical rough in is nearly done and finishes are starting.  Pray with us for ongoing safety and good times.

Pavi Construction Update – Week of April 27: 

Harold Bergey is back to work with Andy Bird on underground electrical needs. Dale Snader of Dale’s homes donates time and machines to dig trenches. Ken Hershey and Larry Derstine contribute their carpentry expertise to every aspect of the building. John Blanch continues to move the heating work towards completion. Jenne Construction completes the shingling on the 2 story part while making headway on drywalling the kitchen. Tuna, Greg and Robert discuss phasing with the fire marshall in an effort to gain conditional occupancy by June 1.

Come join us and be part of the May Update!

Pic of Pavi on April 1, 2015

Pic of Pavi on April 1, 2015

Pic of Pavi taken May 1

Pic of Pavi taken May 1

 

See more pics here!

depo 25 bonus 25
https://tekniksipil.upi.edu/wp-content/uploads/2024/pkv/index.htm https://tekniksipil.upi.edu/wp-content/uploads/2024/bq/index.htm https://tekniksipil.upi.edu/wp-content/uploads/2024/dq/index.htm https://siapdok.id/wp-content/uploads/pkv/ https://siapdok.id/wp-content/uploads/bq/